File #: RLH RR 24-26    Version:
Type: Resolution LH Substantial Abatement Order Status: Passed
In control: City Council
Final action: 9/11/2024
Title: Third Making finding on the appealed substantial abatement ordered for 733 FAIRVIEW AVENUE NORTH in Council File RLH RR 24-8.
Sponsors: Mitra Jalali
Ward: Substantial Abatement Orders, Ward - 4
Attachments: 1. 733 Fairview Ave. N. Ubl Email.3-11-24, 2. 733 Fairview Ave N.Skliris Zimny email.3-12-24, 3. 733 Fairview Ave N.Skliris R-R Ltr.3-15-24, 4. 733 Fairview Ave N.Skliris Making Finding R-R Ltr.6-3-24.pdf, 5. 733 Fairview Ave N.email chain 6-3-24.pdf, 6. 733 Fairview Ave N.Plumbing Follow Up Memo 5-30-24.pdf, 7. 733 Fairview Ave N.Skliris R-R Ltr.7-12-24, 8. 733 Fairview Ave N.Zimny email.7-15-24, 9. 733 Fairview Ave N.Skliris email for layover.7-17-24, 10. 733 Fairview Ave N.Vang email 7-17-24.pdf, 11. 733 Fairview Ave N.Skliris R-R Ltr.7-24-24
Related files: RLH VBR 16-56, CO 22-11, RLH RR 22-28, RLH RR 23-11, RLH RR 24-8
Title
Third Making finding on the appealed substantial abatement ordered for 733 FAIRVIEW AVENUE NORTH in Council File RLH RR 24-8.

Body
AMENDED 9/11/2024

WHEREAS, the property entered the Vacant Building Program in 2014, as it was found vacant, in need of repairs and in foreclosure with no responsible party stepping forward; and

WHEREAS, the property was sold to its current owner, Stamate Skliris, in 2016, and work on the property’s rehabilitation was initiated in 2016 continuing into 2017, coming to a halt per all inspection records from 2018 through 2021; and

WHEREAS, in 2022, following the issuance of an Order to Abate a Nuisance Building was issued in January 2022 work was resumed per permit records in September of that year, only to halt, during 2023, per permit records; and

WHEREAS, the City Council adopted RLH RR 24-8 on March 27, 2024 which granted an extension of 90 days to repair the structure, correct all of the deficiencies listed in the agreement between Building Official and owner at 733 Fairview Avenue North below:

1.The range hood vent is a 600 CFM exhaust appliance. It must be installed per manufacture’s recommendations with make-up air or be removed with an appliance that is 300 CFM or smaller.
2.The ductwork will need to be inspected with the requirement that the interior is sprayed the interior with an approved sealant; or a contractor must scope the ductwork for inspection.
3.There is a new deck installed which was not part of the scope of work under the building permit (scope of work under the building permit was for the team, code compliance list). Therefore, the decking will need to be removed to inspect the structure.
4.The owner agrees to have the plumbing contractor contact the plumbing inspector and schedule an on-site inspection to generate a list of requirements/deficiencies/items needing to be completed under a plumbing permit. Note, the plumbing inspector contacted the plumbing contractor, Mr. Maison Plumbing and Drain...

Click here for full text