Title: Approving the application of Flannery Construction, represented by John Noble, Project Manager, for a sound level variance in order to conduct I-Beam Drilling and other Utility Construction work for supporting adjacent structures and building at 72 Cesar Chavez Street, scheduled for September 1 through September 15, 2016.
Sponsors: Rebecca Noecker
Ward: Ward - 2
Attachments: 1. Flannery Const.Application, 2. Flannery Const.ENS, 3. Flannery Const.Map, 4. Flannery Const.Notice to Prop Owners, 5. Flannery Const.List of Prop Owners, 6. Flannery Const.Letter to Applicant
Title
Approving the application of Flannery Construction, represented by John Noble, Project Manager, for a sound level variance in order to conduct I-Beam Drilling and other Utility Construction work for supporting adjacent structures and building at 72 Cesar Chavez Street, scheduled for September 1 through September 15, 2016.

Body
WHEREAS, Chapter 293 of the Saint Paul Legislative Code was enacted to regulate the subject of noise in the City of Saint Paul; and

WHEREAS, §293.09 provides for the granting of variances from the sound level limitations contained in §293.07, upon a finding by the City Council that full compliance with Chapter 293 would constitute an unreasonable hardship on the applicant, other persons or on the community; and

WHEREAS, Flannery Construction, represented by John Noble, Project Manager, who has been designated as the responsible person on the application, has applied for a variance, for construction work related to use of various pieces of equipment, including I-Beam Directional Drilling and other utility construction work for supporting adjacent structures and sidewalk; and

WHEREAS, to reduce the time required and to minimize disruption to the neighborhood, area businesses, the public, adjoining residents, and property owners, the applicant is seeking a variance from September 1, 2016 through September 15, 2016 from 7 a.m. to 4:30 p.m.; and

WHEREAS, if applicant is not granted a variance, Flannery Construction will not be able to operate various pieces of equipment, including H-pile lagging equipment, excavator, bulldozer, trucks, etc. to be used as part of the construction site for supporting adjacent structures and sidewalk; and

WHEREAS, the Department of Safety and Inspections (DSI) has reviewed the application and has made recommendations regarding conditions for the variance; now, therefore, be it

RESOLVED, that the Council of the City of Saint Paul hereby grants a variance to Flannery Construction, subject to t...