Saint Paul logo
File #: RES 25-74    Version: 1
Type: Resolution Status: Archived
In control: Board of Water Commissioners
Final action: 1/14/2025
Title: Pertaining to Title XI water related fees and charges of the Legislative Code of the City of Saint Paul regarding the organization of fees and charges.
Attachments: 1. Staff Report, 2. Resolution 25-74
Title
Pertaining to Title XI water related fees and charges of the Legislative Code of the City of Saint Paul regarding the organization of fees and charges.



Body
WHEREAS, Saint Paul Regional Water Services staff has completed a legislative code review of Title XI; and
WHEREAS, after consideration of the code review, consolidation of fees and charges would provide for a more efficient review of financial values; now, therefore be it
RESOLVED, that pursuant to Section 85.08 of the Saint Paul Legislative Code the Board of Water Commissioners of the City of Saint Paul hereby recommends the following fees and charges schedule.

Section 85.08 - Fee Schedule

2025

Cost and payment of street service connections (Section 87.13)
Installation of street service connections installed by SPRWS - Actual cost*
Installation of street service connection inspected by SPRWS (2" and smaller) - $300.00
Installation of street service connections inspected by SPRWS (3" and larger) - $600.00
Meter seal - $75.00
Cut off street service connection inspected by SPRWS (2" and smaller) - $300.00
Cut off street service connection inspected by SPRWS (3" and larger) - $600.00

Restoration of public right of way charges (Section 87.13)
Mobilization for paved and oil streets - bituminous - $288.54 per occurrence
Place and finish bituminous material - $13.46 per cubic foot
Mobilization for finished concrete surface - concrete - $199.76 per occurrence
Place and finish concrete pavement - $29.19 per cubic foot
Place concrete base - excludes bituminous - $13.66 per cubic foot
Place concrete curb and/or gutter - $45.69 per linear foot
Place concrete sidewalk panel(s) - $29.19 per cubic foot
Place dirt and seed - boulevards - $194.20 per occurrence
Mobilization for temporary patches - includes removals - $498.64 per occurrence
Place cold mix/winter concrete for temporary patches - includes removals - $51.93 per cubic foot

Thawing of frozen water services charges (Section 87.18)
1 1/4-i...