File #: RES 21-262    Version: 1
Type: Resolution Status: Passed
In control: City Council
Final action: 2/24/2021
Title: Authorizing using a Project Labor Agreement for the 2021 Citywide Sidewalk Contract, Downtown Brick Removal, Griggs-Scheffer Paving Project Phase 2, Hamline Avenue Mill and Overlay, Pelham Boulevard Bump-Outs, Saint Paul and Jefferson Avenue Pedestrian Improvements, Eastbound Kellogg Boulevard Bridge and Kellogg-Third Street Bridge, and authorizing not using a Project Labor Agreement on the Bancroft Stairs and Arterial Corridor Management.
Sponsors: Amy Brendmoen
Title
Authorizing using a Project Labor Agreement for the 2021 Citywide Sidewalk Contract, Downtown Brick Removal, Griggs-Scheffer Paving Project Phase 2, Hamline Avenue Mill and Overlay, Pelham Boulevard Bump-Outs, Saint Paul and Jefferson Avenue Pedestrian Improvements, Eastbound Kellogg Boulevard Bridge and Kellogg-Third Street Bridge, and authorizing not using a Project Labor Agreement on the Bancroft Stairs and Arterial Corridor Management.
Body
WHEREAS, the Saint Paul Council adopted a policy on the use of Project Labor Agreements (PLA) pursuant to Council File #09-584 for projects involving $250,000 or more of City funding; and
WHEREAS, Public Works Street Design and Construction is undertaking the following projects in 2021 with total budgets over $250,000:
2021 Citywide Sidewalk Contract: Concrete work including pedestrian ramps and mainline sidewalk.
Downtown Brick Removal: Sidewalks, brick removal, concrete pavement, bituminous pavement, and catch basin replacement.
Griggs-Scheffer Paving Project Phase 2: New pavement, curb and gutter, sidewalks, utility upgrades, and street lighting.
Hamline Avenue Mill and Overlay: Upgrade pedestrian corners to ADA-compliance on mill and overlay routes, repair sidewalk as needed within work vicinity, select curb extension enhancements, possible bituminous paving, signing and striping.
Pelham Boulevard Bump-outs: Curb and gutter work, new catch basins and sewer connections, concrete work, asphalt paving, sodding, and signage/striping.
Saint Paul and Jefferson Avenue Pedestrian Improvements: Concrete work including pedestrian ramps, bump-outs, sidewalk and miscellaneous drainage improvements.
WHEREAS, Public Works Bridge Engineering is undertaking the following projects anticipated for upcoming construction:
Bancroft Stairway Replacement: Removal of existing stairway and concrete sidewalk, slope stabilization, grading, reinforced concrete abutments and tubular footings, prefabricated steel stairway system, conc...

Click here for full text