Saint Paul logo
File #: RES PH 13-222    Version: 1
Type: Resolution-Public Hearing Status: Passed
In control: City Council
Final action: 9/18/2013
Title: Approving the petition of David Brooks to right-of-way easement rights over a portion of a public alley in the block bounded by Wacouta Street, Wall Street, Sixth Street, and Seventh Street, for a pedestrian bridge.
Sponsors: Dave Thune
Attachments: 1. General Map, 2. Map of Alley, 3. Survey Drawing & Bridge Plan
Title
Approving the petition of David Brooks to right-of-way easement rights over a portion of a public alley in the block bounded by Wacouta Street, Wall Street, Sixth Street, and Seventh Street, for a pedestrian bridge.

Body
BE IT RESOLVED, that upon the petition of David Brooks, as documented in Office of Financial Services Vacation File Number 11-2013, the public property described and depicted in Exhibit A is hereby vacated and discontinued as public property, subject to the following conditions:

1. An easement shall be retained within the existing public right-of-way below the proposed vacation area on behalf of District Energy St. Paul, Inc. and District Cooling St. Paul, Inc. The utility will not object to the vacation, within the area defined above, provided that the cost reimbursement is agreed to for any required utility relocation and subject ot the following conditions:

a) District Energy St. Paul, Inc. and District Cooling St. Paul, Inc. have and shall be permitted to maintain direct buried heating and direct buried cooling facilities below the proposed vacation area.

b) A utility easement, subsurface, surface and overhead below the entire proposed vacation area shall be retained in the right-of-way for the benefit of District Energy St. Paul, Inc. and District Cooling St. Paul, Inc. to maintain, inspect, repair, construct or reconstruct the existing heating and cooling utilities or any new facilities related to the heating and cooling piping and/or its equipment or any part thereof and to enter upon said easement or any portion at any time and from time to time.

c) If a utility relocation is required due to the work in the proposed vacation area or development of adjacent properties associated with work in the proposed vacation area, it shall only be completed by District Energy St. Paul, Inc., its agents and its designated contractors. Full and complete cost reimbursement is required for any required r...

Click here for full text
Date NameDistrictOpinionCommentAction
No records to display.