Saint Paul logo
File #: RES 24-973    Version: 1
Type: Resolution Status: Archived
In control: Board of Water Commissioners
Final action: 7/9/2024
Title: Pertaining to an Amendment No. 3 to Agreement with Short Elliott Hendrickson, Inc. to provide professional engineering services during the reconditioning of the Board’s elevated water towers.
Attachments: 1. Staff Report, 2. Resolution 24-973
Title
Pertaining to an Amendment No. 3 to Agreement with Short Elliott Hendrickson, Inc. to provide professional engineering services during the reconditioning of the Board’s elevated water towers.


Body
WHEREAS, the Board of Water Commissioners of the City of Saint Paul (the “Board”) desires to obtain professional engineering services for the reconditioning of the Board’s Highland #2 elevated water tower; and

WHEREAS, at its February 8, 2022 meeting, the Board approved Contract No. 3407 with Short Elliott Hendrickson, Inc. (“SEH”) to provide professional engineering services during the reconditioning of the Board’s Ferndale Street elevated water tower, which Agreement provided for the same scope of work to be provided for Highland #2 and Highland #3 upon mutual agreement; and

WHEREAS, at its July 11, 2023 meeting, the Board approved an Amendment No. 1 to Contract No. 3407 with SEH to provide professional engineering services during the reconditioning of the Board’s Highland #3 elevated water tower at a cost not to exceed of $84,200; and

WHEREAS, at its December 12, 2023, meeting, the Board approved an Amendment No. 2 with Short Elliott Hendrickson, Inc. (“SEH”) to provide professional engineering services during the reconditioning of the Board’s Highland #2 elevated water tower at a cost not to exceed $96,700 and a Highland #3 rate adjustment cost not to exceed $2,838; and

WHEREAS, during the pre-blasting work on Highland #2 it was revealed that the roof rafters have high metal loss, are badly corroded, and require repair. As such, SEH and Board staff wish to amend the Agreement to add structural design to the Highland #2 scope of services at a cost not to exceed $29,500; now, therefore, be it

RESOLVED, that the Board of Water Commissioners of the City of Saint Paul hereby requests that City of Saint Paul Contracts and Analysis Services draft an Amendment No. 3 to the Agreement with Short Elliott Hendrickson, Inc. dated February 9, 2022 known as ...

Click here for full text