Saint Paul logo
File #: Ord 19-75    Version:
Type: Ordinance Status: Passed
In control: City Council
Final action: 1/8/2020
Title: Amending Chapter 33 of the Saint Paul Legislative Code pertaining to Establishment of Permit Fees, Certificate of Compliance, and Fence Requirements.
Sponsors: Amy Brendmoen
Ward: Ward - all
Attachments: 1. Memo from DSI Director re: 2020 Fee Increases, 2. brcsupportfor2020feeincreases
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
1/15/20201 Mayor's Office Signed  Action details Meeting details Not available
1/8/20201 City Council AdoptedPass Action details Meeting details Video Video
12/18/20191 City Council Public Hearing Closed; Laid Over to Fourth Reading/Final AdoptionPass Action details Meeting details Video Video
12/11/20191 City Council Laid Over to Third Reading/Public Hearing  Action details Meeting details Video Video
12/4/20191 City Council Laid Over to Second Reading  Action details Meeting details Video Video

Title

Amending Chapter 33 of the Saint Paul Legislative Code pertaining to Establishment of Permit Fees, Certificate of Compliance, and Fence Requirements.

 

Body

THE COUNCIL OF THE CITY OF SAINT PAUL DOES ORDAIN:

 

SECTION 1

*****

 

Section 33.04, 33.06, and 33.07 of the Saint Paul Legislative Code is hereby amended to read as follows:

 

Sec. 33.04. - Establishment of permit fees.

 

(a)   Fees required. Before issuing any permit required by the building code, this chapter or other pertinent provisions of the Saint Paul Legislative Code, the fee as indicated in the following schedule shall be paid.

 

Where work for which any such permit is required is started or proceeded with prior to obtaining said permit, the fee specified shall be collected and, in addition, a penalty fee shall be collected. The penalty fee shall be equal to the specified permit fee. The payment of such penalty fee shall not relieve any person from fully complying with the requirements of the building codes in the execution of the work or from any other penalty prescribed herein.

 

Building valuation for the purpose of establishing building permit fees shall be as set forth by the valuation data published by the Building Code Division, Department of Administration, State of Minnesota, as may be amended from time to time.

 

Value of work other than that included in the valuation data published by the Building Code Division, State of Minnesota, must include the cost of installations, alterations, additions or repairs, including all labor and materials supplied by the contractor and other sources. The building code officer may require the contractor to furnish the city with a written statement of the actual cost of the work. When such costs exceed those for which the permit was issued, an additional permit fee will be required and collected based on the fee schedule established herein.

 

TABLE A

BUILDING PERMIT FEES FOR

GENERAL CONSTRUCTION

 

 

Total Valuation                      Fee

Up to $2,000.00                     $31.88 $32.52 for the first $500.00 plus $4.17 $4.25 for each additional $100.00 or fraction thereof, to and including $2,000.00

$2,001.00 to $25,000.00                     $94.40 $96.29 for the first $2,000.00 plus $18.89 $19.27 for each additional $1,000.00 or fraction thereof, to and including $25,000.00

$25,001.00 to $50,000.00                     $528.67 $539.24 for the first $25,000.00 plus $13.62 $13.89 for each additional $1,000.00 or fraction thereof, to and including $50,000.00

$50,001.00 to $100,000.00                     $868.90 $886.28 for the first $50,000.00 plus $9.45 $9.63 for each additional $1,000.00 or fraction thereof, to and including $100,000.00

$100,001.00 to $500,000.00                     $1,340.92 $1,367.74 for the first $100,000.00 plus $7.59 $7.74 for each additional $1,000.00 or fraction thereof, to and including $500,000.00

$500,001.00 to $1,000,000.00                     $4,381.50 $4,469.13 for the first $500,000.00 plus $6.38 $6.50 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00

$1,000,001.00 and up                                          $7,569.20 $7,720.58 for the first $1,000,000.00 plus $4.90 $5.00 for each additional $1,000.00 or fraction thereof.

 

Other inspections and fees (applicable to all sections of chapter 33):

(1)  Inspections outside of normal business hours….                      $115.00 $117.00 per hour

      (Minimum charge-Two (2) hours)

(2)  Reinspection fees .....                     $76.00 $78.00 per hour

      (Minimum charge-One (1) hour)

(3)  Inspections or other services for which no fee is specifically ..                      $76.00 $78.00 per hour

      Indicated (Minimum charge-One hour)

(4)  Additional plan review required by changes, additions or revisions                      $76.00 $78.00 per hour

                     to approved plans ..... (Minimum charge-One hour)

(5)  Inspections of buildings to be moved:

      (a)Garages and group U occupancies .....                     $76.00 $78.00

      (b)                     Dwellings other than group U occupancies .....                     $115.00 $117.00

      (c)                     Structures located outside city limits will have an additional fee

                     of seventy-six dollars ($76.00) seventy-eight dollars ($78.00) per hour

                     including travel time (Minimum charge-One (1) hour)

 

*****

(g)                     Other permit fees: Permit fees for other than general construction shall be as follows:

(1)                     Wrecking of buildings or structures. Five dollars ($5.00) per one thousand (1,000) cubic feet or fraction thereof, minimum seventy-six dollars ($76.00) seventy-eight dollars ($78.00), with the exception of signs as specified in paragraph (10) below.

(2)                     Moving of buildings or structures. Buildings larger than twelve (12) feet high, fourteen (14) feet wide, twenty-five (25) feet long other than buildings used for group U, division 1, occupancies: Two hundred seventy-five dollars ($275.00) Two hundred eighty-one dollars ($281.00) per move. Group U, division 1, occupancy buildings larger than twelve (12) feet high, fourteen (14) wide, twenty-five (25) long: Ninety-one dollars ($91.00) Ninety-three dollars ($93.00) per move. Buildings or structures smaller than size indicated above:  ($76.00) Seventy-eight dollars ($78.00) per move.

(3)                     Elevators, dumbwaiters, moving stairways, handicapped lifts and other similar devices:

a.                     New construction, repairs and major alterations: One and one-half percent of the total valuation of the work. Minimum charge shall be one hundred thirty-five dollars ($135.00) one hundred thirty-eight dollars ($138.00).

b.                     Annual inspection fees:

1.  Power driven passenger and freight elevator:

Up to 5 floors in height .....$91.00 $93.00

6 to 10 floors in height ..... $104.00 $106.00

11 to 20 floors in height ..... $116.00  $118.00

21 or more floors in height .....  $130.00  $133.00

2.   Dumbwaiter ..... $76.00  $78.00

3.  Moving stairway .....$76.00  $78.00

4.  Docklift .....  $76.00  $78.00

5.  Handpowered elevator ..... $76.00  $78.00

6.  Manlift .....  $76.00  $78.00

(4)                     Electrical work. For electrical work the permit fee charges shall be made at the following rates; provided, however, the minimum fee for any permit shall be: one-family dwelling electrical work seventy-six dollars ($76.00) seventy-eight dollars ($78.00), multifamily, commercial and industrial work, seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

a.                     Service: New service, change of service, temporary service, addition, alteration or repair on either primary or secondary service up to six hundred (600v) shall be seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

b.                     Circuits: The fee for the installation of new circuits and/or feeder additions, alterations or repairs to existing circuits up to six hundred (600v) shall be thirteen dollars ($13.00).

c.                     Transformers, capacitors, and generation for light, heat and power: Transformers, capacitors, and generation for light, heat and power shall be computed separately at forty-eight dollars ($48.00) forty-nine dollars ($49.00) per unit plus one dollar ($1.00) per KVA, KVAR or fraction thereof. In addition to the above fees, the fee for all transformers for signs and outline lighting shall be seventy-six dollars $76.00 seventy-eight dollars ($78.00) per sign.

d.                     Alterations, repairs, or extension of electrical systems: For any alteration, repair or extension of an existing electrical system where the work is of such a nature that the fees for a permit cannot be determined from the above schedule, the permit fee charge shall be based on one percent of the total valuation of the work. Minimum fee shall be seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

e.                     Low-voltage fire alarm systems, remote-control circuits, signal circuits, and low-energy or low-voltage power circuits: For remote control circuits, signal circuits, and low-energy or low-voltage power circuits (in other than single-family dwellings) the permit fee charge shall be:

1.  Fire alarms, per control .....$76.00 $78.00

                     Plus, for each opening .....$1.84 $1.88

2.                     Others, per control ..... $76.00 $78.00

                     Plus, for each opening ...$1.84 $1.88

f.                     Traffic signals: For traffic signals the permit fee charge shall be made at the rate of forty-eight dollars ($48.00) forty-nine dollars ($49.00) for each service location plus eight dollars ($8.00) for each standard.

g.                     Street lighting: For street lighting the permit fee charge shall be made at the rate of thirty-four dollars ($34.00) thirty-five dollars ($35.00) for each control unit plus eight dollars ($8.00) for each standard.

h.                     Electric space heating:

0 to 4000 watts ..... $19.00 $20.00

4001 watts and up ..... $27.00 $28.00

i.                     Transient projects: For permits on transient projects, including, but not limited to, carnivals and circuses, the inspection fees shall be computed as follows:

Power supply units: According to items (a), (b) and (c) of the electric work fee schedule. All rides, devices and concessions shall be inspected. The inspection fee shall be twenty-eight dollars ($28.00) twenty-nine dollars ($29.00) per unit.

j.                     Swimming pools: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00) plus circuit charge.

k.                     Renewable energy (solar, wind, etc.): The fee shall be one hundred thirty-five dollars ($135.00) one hundred thirty-eight dollars ($138.00) for zero (0) - twenty(20) KW systems, three hundred twenty-five dollars ($325.00) three hundred thirty-two dollars ($332.00) for twenty-one (21) - forty (40) KW systems, and for systems above forty (40) KW, three hundred twenty-five dollars ($325.00) three hundred thirty-two dollars ($332.00) plus three dollars ($3.00) for every KW above forty (40) KW (kilowatt).

(5)                     Gas burner, oil burner, coal burner and other fuel burners: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00) for the first one hundred thousand (100,000) BTU per hour input or fraction thereof, plus thirteen dollars ($13.00) for each additional one hundred thousand (100,000) BTU per hour or fraction thereof. Maximum fee for each individual burner shall be nine hundred one dollars ($901.00) nine hundred nineteen dollars ($919.00). Where dual fuel installations are made, the maximum combined permit fee shall not exceed one thousand six hundred thirty-seven dollars ($1,637.00) one thousand six hundred seventy dollars ($1,670.00).

(6)                     Plastering, stucco, re-dash, patching, veneer plaster, exterior insulation finish system and spray-on fireproofing. The fee is one (1) percent of the valuation of the work; provided, however, that the minimum fee for any permit is seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

(7)                     Plumbing fees:

a.                     Drain waste and vent, water supply and fixtures.

1.                     The fee for all initial permits issued by the department of safety and inspections shall be eighty-two dollars ($82.00) eighty-four dollars ($84.00). In addition to this fee, the fee for each fixture, whether set, rough-in, or replaced shall be thirty-two dollars ($32.00) thirty-three dollars ($33.00). Each water supply fixture shall be six dollars ($6.00).

b.                     Building sewer permit fees ..... $76.00 $78.00

c.                     Each private waste treatment system ..... $230.00 $235.00

d.                     Gas burning water heaters, dryers, ranges or other devices including gas piping:

1.                     Base fee (includes first device/appliance up to 100,000 BTUs) .....$76.00 $78.00

2.                     Each additional device/appliance .....$30.00  $32.00

3.                     Each additional 100,000 BTUs or portion thereof .. $13.00

4.                     Maximum fee .....  $901.00 $919.00

(8)                     Standpipes, sprinklers and fire pumps; new installations, repairs or alterations:

a.                     The minimum fee shall be seventy-six dollars ($76.00) seventy-eight dollars ($78.00), in addition to which the following fees shall be paid:

1.                     Standpipes:  Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00) for each standpipe for the first five (5) floors, plus seven dollars ($7.00) eight dollars ($8.00) for each floor above the fifth.

2.                     Sprinklers: Twenty dollars ($20.00) for each additional ten (10) sprinkler heads or fraction thereof.

3.                     Fire pumps: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00) for each pump.

b.                     Fire extinguishing systems utilizing an extinguishing agent other than water, new installations, repairs or alterations: The fee shall be one percent of the valuation of the installation, repair or alteration with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

c.                     Plan review fees shall be sixty-five (65) percent of the fee as set forth in items a and b. A plan review shall be required for all new systems, special extinguishing agents, and permits having over twenty-five (25) sprinklers.

(9)                     Fire alarm systems:

a.                     The minimum fee shall be seventy-six dollars ($76.00) seventy-eight dollars ($78.00), in addition to which the following fees shall be paid:

1.                     Fire alarm control unit: Twenty-two dollars ($22.00) per unit.

2.                     Fire alarm opening: Two dollars ($2.00) per device.

b.                     A plan review shall be required for all new systems and permits having over one hundred (100) fire alarm openings. The plan review fee shall be sixty-five (65) percent of the fee set forth in item a.

(10)                      Smoke control systems:

a.                     The base fee for the review and approval of a smoke control system shall be two-hundred seventy-one dollars ($271.00) two hundred seventy-six dollars ($276.00), in addition to which the following fees shall be paid:

1.  Acceptance testing: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00) per hour of fire engineering inspection time.

(11)                      Water flow testing:

a.                     Water flow data, less than three (3) years old, shall be provided to verify hydraulic calculations for automatic fire protection systems. The fee for this service shall be seventy-six dollars ($76.00) seventy-eight dollars ($78.00). This fee is to be applied at the time of permit issuance.

(12)                       Refrigeration:

a.                     Refrigeration permit: One (1) percent of total value of work, minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

b.                     Total value of work is defined under section 33.04(a).

(13)                       Signs, billboards, marquees and awnings:

a.                     Wall signs and projecting signs: Two dollars and seventy-eight cents ($2.78) Two dollars and eighty-four cents ($2.84) for each square foot with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

b.                     Marquees over public property: One hundred forty-nine dollars ($149.00) One hundred fifty-two dollars ($152.00) for each installation.

c.                     Repair permit: Twenty-five (25) percent of the fee for a new sign with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

d.                     Awnings projecting over public property: Two dollars and ten cents ($2.10) Two dollars and fourteen cents ($2.14) per lineal foot, minimum seventy-six dollars ($76.00) seventy-eight dollars ($78.00) for each installation. A separate sign permit is required for awnings with signage.

e.                     Roof and freestanding signs: Two dollars and eighty-eight cents ($2.88) Two dollars and ninety-four cents ($2.94) for each square foot with a minimum fee of eighty-one dollars ($81.00) eighty-three dollars ($83.00).

f.                     Demolition permit: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00).

g.                     Temporary and portable signs: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00).

h.                     Billboard extension permits: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00).

i.                     Additional fees:

1.                     Additional fee for business signs located in a special sign district when there are additional regulations that must be reviewed: twenty-seven dollars ($27.00) twenty-eight dollars ($28.00).

2.                     Fifty cent ($0.50) Minnesota state surcharge required for all signs attached to a building for permit fees up to and including one thousand dollars ($1,000.00). For permit fees over one thousand dollars ($1,000.00) the rate is 0.0005 per permit fee dollar.

j.                     A separate electrical permit is required for all electrical work done on signs that are lit, whether internal or external.

k.                     If building modifications are necessary to accommodate a sign installation, an additional building permit shall be required.

(14)                       Steamfitting and hot water work:

a.                     Fee for new construction or alteration shall be one (1) percent of total valuation of the work.   Value of work must include the cost of installation, alteration, addition and repairs including heat transfer units, accessories to the heating system, including pipe, fittings, and all labor and materials necessary for installation. In addition, it shall include all materials supplied by other sources when these materials are normally supplied by the contractor.

b.                     Minimum permit fee for commercial, industrial, institutional or business occupancies is seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

c.                     The fee for alterations, additions and repair to existing refrigeration, gas and oil systems shall be based on one (1) percent of total valuation of the work with seventy-six dollars ($76.00) seventy-eight dollars ($78.00) minimum.

(15)                       Warm air, heating, ventilation and sheet metal:

a.                     Mechanical warm air heating systems: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00) for the first 100,000 BTU per hour or fraction thereof, plus thirteen dollars ($13.00) for each additional one hundred thousand (100,000) BTU per hour or fraction thereof.

b.                     Ventilation systems, dust collection systems, pollution control systems, etc.:

                     One (1) percent of total valuation of the work. Value of work must include the cost of installation, alteration, addition and repair, including all labor and materials necessary for installation. The minimum fee shall be seventy-six dollars ($76.00) seventy-eight dollars ($78.00) for commercial buildings and seventy-six dollars ($76.00) seventy-eight dollars ($78.00) for residential ventilation work and duct modification.

c.                     General sheet metal: A separate permit is required for general sheet metal work. For gutters, flashing, metal chimneys, chutes or general sheet metal work, the fee shall be one (1) percent of the total valuation of the work. The minimum fee is seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

(16)                     Incinerators:

a.                     Domestic incinerators: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00) for each installation.

b.                     Commercial and industrial incinerators: One (1) percent of total value of work, minimum seventy-six dollars ($76.00) seventy-eight dollars ($78.00) for each installation.

(17)                     Fences Permit/Plan Review: Forty dollars ($40.00) Forty-one dollars ($41.00) for the first 200 lineal feet or fraction thereof erected and thirteen dollars ($13.00) for each additional 100 lineal feet or fraction thereof.

(18)                     Other projects: For alterations, repairs or extensions for which the fee charge cannot be determined by items (1) through (14) above, the fee charge shall be based on one (1) percent of the total valuation of the work, with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

(19)                     Reserved.

(20)                     Solid fuel burning freestanding heaters and stoves, nonmasonry fireplaces and fire place inserts: Seventy-six dollars ($76.00) Seventy-eight dollars ($78.00). Method for providing positive combustion air must be provided with permit application.

(21)                     Solar heating systems: Permit fees for solar heating systems shall be one (1) percent of total valuation, with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

(22)                     Parking lots:

a.                     Permit fees for parking lots shall be one (1) percent of total valuation, with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00). No parking lot or loading and unloading area requiring approval under the provisions of Legislative Code sections 62.103 and 62.105 shall be constructed nor shall any existing unimproved lot be paved without first obtaining a building permit. Such lots shall not be used until the construction has been completed and approved by the building code officer.

b.                     No off-street parking lot or loading and unloading area shall be repaved, modified, reconfigured or enlarged without first obtaining a building permit. The permit fee shall be one (1) percent of the total valuation, with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

(23)                     Tank installation and removal as outlined in Sec. 55.10 (i).

(24)                     Other piping: Includes process piping and miscellaneous piping that is not otherwise regulated under the state plumbing or mechanical code. The fee for other piping permits: One (1) percent of the total valuation, with a minimum fee of seventy-six dollars ($76.00) seventy-eight dollars ($78.00).

(25)                     Grading: For the placement, removal or movement of:

a.                     Up to one thousand (1,000) cubic yards of fill, thirty-five dollars ($35.00) thirty-six dollars ($36.00) for the first one hundred (100) cubic yards, plus twenty-six dollars ($26.00) twenty-seven dollars ($27.00) for each one hundred (100) additional cubic yards or fraction thereof.

b.                     Between one thousand one (1,001) and ten thousand (10,000) cubic yards of fill, two hundred fifty-eight dollars ($258.00) two hundred sixty-three dollars ($263.00) for the first one thousand (1,000) cubic yards, plus twenty-two dollars ($22.00) for each additional one thousand (1,000) cubic yards or fraction thereof.

c.                     Between ten thousand one (10,001) and one hundred thousand (100,000) cubic yards of fill, four hundred forty-three dollars ($443.00) four hundred fifty-two dollars ($452.00) for the first ten thousand (10,000) cubic yards, plus ninety-four dollars ($94.00) ninety-six dollars ($96.00) for each additional ten thousand (10,000) cubic yards or fraction thereof.

d.                     Greater than one hundred thousand (100,000) cubic yards of fill, one thousand two hundred ninety-one dollars ($1,291.00) one thousand three hundred seventeen dollars ($1,317.00) for the first one hundred thousand (100,000) cubic yards, plus fifty-two dollars ($52.00) fifty-three dollars ($53.00) for each additional ten thousand (10,000) cubic yards or fraction thereof.

(26)                     Vacant building rehabilitation permit: Two hundred ninety-one dollars ($291.00) Two hundred ninety-seven dollars ($297.00).

 

 

(h)  Fees, exemption for city: The city shall be exempted from the payment of permit fees required under this chapter where work is done by city employees on city-owned property not exclusively leased or rented to a party other than the city.

 

It is the intent of this paragraph only that payment of fees are waived. Permits as required by other sections of the Saint Paul Legislative Code are to be applied for and issued, inspections are to be made as required and compliance with all other requirements must be made.

 

*****

SECTION 2

 

Sec. 33.06. - Certificate of compliance.

(a)  The building official may issue a certificate of compliance for any building or structure in Group R-3 or M occupancies when it is determined that such building or structure complies with the provisions of chapter 34 of the Saint Paul Legislative Code. The fee required for inspection of the property and issuance of a certificate of compliance shall be four hundred eighty-three dollars ($483.00) four hundred ninety-three dollars ($493.00) for a single-family dwelling and six hundred six dollars ($606.00) six hundred eighteen dollars ($618.00) for a two-family dwelling and shall be paid upon application for a code compliance inspection. In the case of vacant total remodel compliance, the fee shall be one hundred thirty-six dollars ($136.00) one hundred thirty-nine dollars ($139.00) for single-family dwelling and one hundred fifty-seven dollars ($157.00) one hundred sixty dollars ($160.00) for a two-family dwelling. For vacant total remodel compliance, the fee shall be due upon approval of a total remodel agreement between the applicant and the department of safety and inspections and shall accompany an application for a demolition permit.

 

(b)  The building official may issue a certificate of compliance for any building or structure in Group R-1 occupancy, as defined in the Minnesota State Building Code, when it is found that such building or structure complies with the provisions of Chapter 34 of the Saint Paul Legislative Code. This fee, in addition to the certificate of occupancy fee, shall be six hundred thirty-seven dollars ($637.00) six hundred fifty dollars ($650.00) for a three-family dwelling, six hundred sixty-six dollars ($666.00) six hundred seventy-nine dollars ($679.00) for a four-family dwelling, and six hundred ninety-seven dollars ($697.00) seven hundred eleven dollars ($711.00) for a five-unit building.

 

(c)  There shall be no fee charged for the issuance of a certificate of compliance for new buildings at the completion of their construction covered by a building permit.

 

(d)  The building official may, without further inspection, issue a certificate of compliance for any building or structure which has been issued a fire certificate of occupancy, which issuance was based on an inspection under chapter 40 of the Legislative Code, within the previous twelve-month period.

 

 

*****

SECTION 3

Sec. 33.07. - Fences-Requirements.

 

*****

 

(d) Variances. A variance of the fence height or corner clearance regulations may be granted if, after investigation by the building official, it is found that site, or terrain, or nuisance animal conditions warrant a waiver of the height restrictions. An application fee of seventy-six dollars ($76.00) seventy-six dollars ($78.00) is required for each variance request.

 

*****

(f)  Barbed wire fences. No barbed wire fence shall be constructed within the city limits of the city, except for police and correction facilities, unless the following conditions are complied with:

 

(1)  No fence which uses barbed wire may be built in, or abut, a residentially zoned district or built on or abut a lot occupied residentially.

 

(2)  Barbed wire, not exceeding three (3) strands, may be permitted on the top of a fence; providing, that the arms do not project over public property. The minimum height to the bottom strand of the barbed wire shall not be less than six (6) feet from finished grade.

 

(3)  In all cases where a barbed wire fence is requested, an application shall be made to the building official.

 

(4)  A certificate of insurance indemnifying the City of Saint Paul shall be submitted with the application subject to the approval of the city attorney as to form and in an amount as set forth in Minn. Stat. § 466.04. An annual registration fee of forty-four dollars ($44.00) forty-five dollars ($45.00) shall be paid at the time of the annual certificate of insurance renewal.

 

*****

SECTION 4

This Ordinance shall take effect and be in force thirty (30) days following its passage, approval and publication.

 

 

 

Date NameDistrictOpinionCommentAction
No records to display.