File #: RES 24-973    Version: 1
Type: Resolution Status: Archived
In control: Board of Water Commissioners
Final action: 7/9/2024
Title: Pertaining to an Amendment No. 3 to Agreement with Short Elliott Hendrickson, Inc. to provide professional engineering services during the reconditioning of the Board’s elevated water towers.
Attachments: 1. Staff Report, 2. Resolution 24-973

Title

Pertaining to an Amendment No. 3 to Agreement with Short Elliott Hendrickson, Inc. to provide professional engineering services during the reconditioning of the Board’s elevated water towers.

 

 

Body

WHEREAS, the Board of Water Commissioners of the City of Saint Paul (the “Board”) desires to obtain professional engineering services for the reconditioning of the Board’s Highland #2 elevated water tower; and

 

WHEREAS, at its February 8, 2022 meeting, the Board approved Contract No. 3407 with Short Elliott Hendrickson, Inc. (“SEH”) to provide professional engineering services during the reconditioning of the Board’s Ferndale Street elevated water tower, which Agreement provided for the same scope of work to be provided for Highland #2 and Highland #3 upon mutual agreement; and

 

WHEREAS, at its July 11, 2023 meeting, the Board approved an Amendment No. 1 to Contract No. 3407 with SEH to provide professional engineering services during the reconditioning of the Board’s Highland #3 elevated water tower at a cost not to exceed of $84,200; and

 

WHEREAS, at its December 12, 2023, meeting, the Board approved an Amendment No. 2 with Short Elliott Hendrickson, Inc. (“SEH”) to provide professional engineering services during the reconditioning of the Board’s Highland #2 elevated water tower at a cost not to exceed $96,700 and a Highland #3 rate adjustment cost not to exceed $2,838; and

 

WHEREAS, during the pre-blasting work on Highland #2 it was revealed that the roof rafters have high metal loss, are badly corroded, and require repair.  As such, SEH and Board staff wish to amend the Agreement to add structural design to the Highland #2 scope of services at a cost not to exceed $29,500; now, therefore, be it

 

RESOLVED, that the Board of Water Commissioners of the City of Saint Paul hereby requests that City of Saint Paul Contracts and Analysis Services draft an Amendment No. 3 to the Agreement with Short Elliott Hendrickson, Inc. dated February 9, 2022 known as Contract No. 3407 to provide professional structural engineering services, including design, inspection, and contract administration services for the steel rafters of the Highland #2 elevated water tower, at a cost not to exceed $29,500, and to include all other terms and conditions as may be required; and, be it

 

FURTHER RESOLVED, that the proper officers of the Board are hereby authorized and directed to execute said agreement following approval by the assistant city attorney.

 

 

 

 

 

 