Saint Paul logo
File #: RES 21-10    Version: 1
Type: Resolution Status: Passed
In control: City Council
Final action: 1/20/2021
Title: Approving Ordinance Permit 20200010402A for Stormwater Conveyance Infrastructure Installed by Ryan on the Ford (Highland Bridge) Site
Sponsors: Chris Tolbert
Attachments: 1. Permit20200010402A - Exhibit A - ForCouncil - 2020 01 11

Title

 Approving Ordinance Permit 20200010402A for Stormwater Conveyance Infrastructure Installed by Ryan on the Ford (Highland Bridge) Site

 

Body

WHEREAS, the Saint Paul City Council has adopted the Ford Site Zoning and Public Realm Master Plan and all Amendments to the Plan; and

 

WHEREAS, the Site Improvement Performance Agreement (SIPA) provides for Site Plan Review protocols as well as protocols related to Site Improvements of the Property that are to be completed by Ryan and protocols related to City Acceptance of improvements completed by Ryan; and

 

WHEREAS, in April of 2020 Ryan submitted appropriate Plans, Specifications, Reports, and Documents to the City for review under Site Plan number 20-028740; and

 

WHEREAS, the appropriate City Departments and City Subject Matter Experts reviewed said Plans, Specifications, Reports, and Documents and found same to be in compliance with all applicable Codes, Standards, and Policies such that approval was granted by the Department of Safety and Inspections for site plan 20-028740 on June 30, 2020; and

 

WHEREAS, Article 6 of the SIPA provides for the installation of certain public infrastructure through a permit called the Ordinance Permit; and

 

WHEREAS, on July 28, 2020 appropriate Ordinance Permits were issued by the City to Ryan for the purpose of completing certain stormwater conveyance improvements for the Property; and

 

WHEREAS, with the exception of possible warranty rework that may be required at a later date, Ryan has completed the installation of certain public improvements according to the requirements stated in the SIPA and RDA; and

 

WHEREAS, warranties are assigned per Section 12.7 of the SIPA and maintenance is addressed in Section 9.6; and

 

WHEREAS, Ryan has satisfied all applicable requirements of the Ordinance Permit Acceptance process as required by the SIPA and RDA for the installation of certain public improvements; now, therefore, be it

 

RESOLVED that the City Council accepts the infrastructure as so defined in the attached Exhibit A subject to the following conditions:

 

1. Maintenance of the system components described herein shall transfer to the City per the SIPA with the understanding that:

                     a. Current stormwater treatment systems (“BMP’s”) are being bypassed.

                     b. Contributing catchment areas such as Right-of-Ways are not connected to the system and as such won’t be introducing flows into the system.

                     c. System flows will only be experienced when private connections and contributing catchment areas are connected to the system.

                     d. Right-of-Way catchment areas and Stormwater BMPs are permitted, constructed and accepted via separate Ordinance Permits. Acceptance is anticipated to be in 2021. Maintenance obligations will be per the SIPA. Should acceptance be delayed then maintenance obligations will be delayed.

 

2. As part of acceptance of roadway infrastructure at some future date, an inspection of all sewer structures shall be completed by a joint inspection team consisting of representatives of Ryan and representatives of the City. Any visible deficiencies found during said joint inspection will need to be addressed by Ryan to the satisfaction of, and at no cost to, the City. The City will be the final arbiter as to whether or not the deficiency needs to be corrected. The EOR will also be included in this walk. Any required corrections will be according to applicable Standards, Codes, and Policies.

 

3. Should non-sewer debris be found in the system Ryan or the appropriate secondary developer will be held responsible for cleaning the applicable parts of the system at no cost to the City.

 

4. In keeping with the RDA and the SIPA, identification of where public utilities are located within the site will be coordinated between the Ryan and the City team for any areas where roadways have not been accepted by the City. This coordination will continue until the roadways have been accepted by the City at which point the Gopher State One-Call system will be accessed for site utility locates. Coordination by the Ryan/City team will include providing asbuilt information to secondary developers, onsite meets that include all applicable stakeholders, and onsite marking as needed.

 

AND BE IT FURTHER RESOLVED, that pursuant to the RDA and SIPA the warranty period and associated maintenance obligations shall begin upon City acceptance.

 

Date NameDistrictOpinionCommentAction
No records to display.