File #: RES 25-1738    Version: 1
Type: Resolution Status: Agenda Ready
In control: City Council
Final action:
Title: Approving Ordinance Permit 20240020604 for Sanitary Sewer Infrastructure installed by the Saint Paul Port Authority (SPPA) on The Heights project site at the following locations: on Arlington Avenue between Howard Street and McKnight Road.
Sponsors: Nelsie Yang
Attachments: 1. 20240020604 - ExhibitA.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Approving Ordinance Permit 20240020604 for Sanitary Sewer Infrastructure installed by the Saint Paul Port Authority (SPPA) on The Heights project site at the following locations: on Arlington Avenue between Howard Street and McKnight Road.

Body

WHEREAS, the Saint Paul City Council has adopted the Hillcrest Master Plan and all Amendments to the Plan; and

 

WHEREAS, in 2019 Ordinance 19-39 was adopted by the City Council that provides for the SPPA as “…responsible for the design, engineering, construction and delivery of public infrastructure…” on The Heights project; and 

 

WHEREAS, in October of 2022 the SPPA submitted appropriate plans, reports, and exhibits to begin the Site Plan Review process for The Heights project under SPR# 23-064690; and

 

WHEREAS, Public Works’ Policy “Construction of Public Infrastructure by Private Developers Policy” provides minimum requirements for “…plan review of private developments seeking to install public infrastructure…” in the Public Right-of-Way; and

 

WHEREAS, the City’s Ordinance Permit Policy and associated Ordinances 122 & 123 provides for City installation of improvements completed by the SPPA on The Heights project; and

 

WHEREAS, the appropriate City Departments and City subject matter experts reviewed said Plans, Specifications, Reports, and Documents and found same to be in compliance with applicable Codes, Standards, and Policies such that approval with conditions was granted by the Department of Safety and Inspections on May 17, 2024 for the sanitary sewer system for site plan 23-064690; and

 

WHEREAS, on August 12, 2024, the appropriate Ordinance Permit was issued by the City to the SPPA for the purpose of completing certain sanitary sewer infrastructure improvements for The Heights project; and

 

WHEREAS, with the exception of possible warranty rework resulting from a future inspection(s) prior to the expiration of the warranty period, punch list work, the SPPA has completed the installation of certain public improvements for Ordinance Permit 20240020604 according to the requirements stated in Codes, Standards, and Specifications; and

 

WHEREAS, warranties are assigned per Codes, Standards, and Specifications; and

 

WHEREAS, the SPPA has satisfied most of the applicable requirements of the Ordinance Permit Acceptance process as required Codes, Standards, and Policies for the installation of certain public improvements such that a recommendation is made to the City Council that the public infrastructure identified in Ordinance Permit 20240020604 be accepted with conditions; now, therefore be it

 

RESOLVED, that the City Council accepts the infrastructure as so defined in the attached Exhibit A and pursuant to Codes, Standards, and Specifications for commencement of the warranty period following Council acceptance and with the following condition(s):

1.                     The Developer shall provide CAD drawings for the sewer stubs along Arlington. The CAD shall be provided as part of the acceptance process of ordinance permit 20240020604A.

2.                     The wear course has yet to be placed on Arlington Avenue between Howard Street and McKnight Road and as such punch list may items may arise for manholes and other structures as part of final paving. Any punch list items for sanitary structure encountered as part of the punch list process shall be corrected as part of the applicable ordinance permit within which the punch list was created.

3.                     There is alignment between the Saint Paul Port Authority and the Public Works Department as to interim cleaning of the sanitary mains. By interim it is meant until such time as sanitary flow velocities are at or above 2.0 feet per second.

 

 