8:30 a.m. Hearings  
Remove/Repair Orders  
1
Ordering the rehabilitation or razing and removal of the structures at 1722  
REANEY AVENUE within fifteen (15) days after the December 22, 2021,  
City Council Public Hearing. (Public hearing continued to January 5,  
2022; to refer back to January 11, 2022 Legislative Hearing)  
Prince  
Sponsors:  
Layover to LH February 22, 2021 at 9 am. PO to submit updated construction  
statement, including work plan/schedule based on CC inspection report and including  
evidence of financing by noon Monday February 21, 2022.  
Joseph Rossman, attorney o/b/o Reverse Mortgage Funding, LLC, appeared via phone  
Anthony Hernandez, realtor, appeared via phone  
Moermond: this should be a quick hearing for 1722 Reaney. I have Steve Magner,  
Manager of Code Enforcement. We talked about a couple of things last time, third  
party rehab, construction bid and HUD update. All of this was premised on a Code  
Compliance Inspection that needs to occur. Mr. Magner will update the record.  
Staff update by Manager Steve Magner: a letter was January 14 laying the matter over  
to today for update on third party rehab, HUD application. Reminder that maintenance  
of the property is an ongoing condition. We don’t have a Code Compliance Inspection  
completed yet. Our Code Compliance Inspector is out until February 1. I think a  
number of items are done but haven’t been completed. We may need to lay this over. I  
did see there was a bid submitted for a total of $22,175 but I think the items are the  
items in the order to abate and that’s not a full comprehensive list. Until we have that  
Code Compliance Inspection completed I don’t think the contractor can put a final  
dollar amount on it so it can be sent to HUD for final approval.  
Moermond: so we have a bid that covers things in the original list of why it is a  
nuisance building. This distinguishes that list from the one that needs to be repaired to  
come out of nuisance status. That punch list is the Code Compliance Inspection  
report. The trades have done their walkthroughs, and we’re waiting for the write up. And  
the man who does the write up is on vacation until February 1. We expect that soon  
after. So the $22,175 bid doesn’t address what is required to be reoccupied?  
Magner: yes.  
Moermond: if they aren’t going to be getting a complete Code Compliance Inspection  
list until after February 1 it seems reasonable to give a couple weeks to work on  
getting a revised bid and have conversations with HUD. I’m willing to lay this over, but  
we need to talk about intentions of the bank and what they are hoping to accomplish.  
Mr. Rossman, we talked about a third party rehab and how title couldn’t transfer until  
rehab is complete. Where are you at?  
Rossman: my client’s position, whether it is them or a third party, is to avoid demo and  
get the rehabilitation done to the City’s standards and get that Code Compliance  
certificate. I know we are waiting for that final list now, so we’ll have to redo the bid for  
the work. I don’t have an update on a third party. It would be best case scenario if they  
could find a third party, but if they can’t they do want to avoid the complete demolition.  
I don’t have a specific update on pending sales or purchase agreements. Since the  
last hearing they were going to market it with the disclaimers about it being a property  
under rehab orders from the City.  
Moermond: Mr. Hernandez, do you have any questions?  
Hernandez: no, I don’t have any questions. No one is going to enter into an agreement  
with the seller until they know what they were having to fix.  
Moermond: yes, understandable. My concern is that the title cannot transfer until that  
Code Compliance certificate is issued. Whether Reverse Mortgage hires a general to  
do the work, a purchase agreement with a developer indicating that title won’t transfer.  
The City wants to look at those agreements and approve them and make sure funding  
is available. But agreed, we need that punch list to move forward. I’m going to continue  
this to February 22 so you can get that list and talk with people about what that means  
for you. Any other questions?  
Both: no.  
Laid Over to the Legislative Hearings due back on 2/22/2022  
2
Ordering the rehabilitation or razing and removal of the structures at 1941  
UNIVERSITY AVENUE WEST (STORAGE/GARAGE) within fifteen (15)  
days after the September 22, 2021, City Council Public Hearing. (To be  
referred back to September 28, 2021 Legislative Hearing)  
Jalali  
Sponsors:  
Layover to LH March 8, 2022 at 9 am for update on Neighborhood STAR funding.  
Mr. Dawit Solomon, President Eritrean Community Center of MN, appeared via phone  
Solomon: Essey Asbu may not be available, he had to go out of the country. Ruth and  
Belainesh are out of the country too. So it is just me.  
Moermond: Mr. Magner, has the property been maintained? We can talk about the  
plans you submitted and the STAR Board action and timing.  
Magner: I consulted with staff this morning. Mr. Yannarelly said they are maintaining  
the property, though the garage continues to be in disrepair. I’ve reviewed the plans,  
and the only issue is whether they put a new slab in or not. Looks like the documents  
say they could reuse the slab which could save significant money.  
Moermond: I had a similar observation. Mr. Solomon, you went to the STAR Board and  
they heard you, they are going to do a vote this week online, and it will go to the City  
Council. Staff estimated the resolution would be in the next 2 or 3 weeks. I’m thinking  
you’ll have a firm answer from Council within 4 to 6 weeks. Is that the same calendar  
you have?  
Solomon: yes. I was going to say we are a recipient of the grant program in the past,  
twice. The feedback we got was good so we are very optimistic.  
Moermond: I’d like to continue this to March 8 at which point you’ll have the STAR  
board funding answer. I asked them to let me know ahead of time, and then Mr.  
Magner and I can work so you can pull permits before it goes to Council. Sounds like  
you’ll be doing a bidding process with Kowsar at Planning and Economic Development  
and some more background.  
Solomon: the bid we have is through the STAR process too. In the past contractors  
shy away from the program. So the contractor we got the bid from will be with us  
through the process.  
Moermond: so we’ll talk March 8 and can hopefully put this to bed then. Any  
questions?  
Solomon: No. I tried to get the City Council date, but as soon as I get that I can  
forward it.  
Moermond: I will probably know that before you do but thank you. Take care and stay  
warm. We’ll talk again in six weeks.  
Laid Over to the Legislative Hearings due back on 3/8/2022  
10:30 a.m. Hearings  
RLH RR 21-67  
3
Ordering the rehabilitation or razing and removal of the structures at 1034  
BRADLEY STREET within fifteen (15) days after the December 22,  
2021, City Council Public Hearing. (to refer to January 25, 2022  
Legislative Hearing)  
Brendmoen  
Sponsors:  
Remove within 15 days with no option to repair.  
Sam Coleman, attorney, appeared via phone  
Staff update by Manager Steve Magner: a letter was sent confirming the City Council  
referred the matter back to Legislative Hearing today. By close of business January 21  
a $5,000 Performance Deposit was to be posted, and submit paperwork showing  
initiation of judicial foreclosure action. We haven’t seen a Performance Deposit and we  
did just recently issue a snow letter which resulted in the parks crew doing an  
abatement January 12 to do the sidewalks.  
Moermond: and we haven’t seen any paperwork in our office. Mr. Coleman?  
Coleman: my client has decided to let the property go. I suggested they just release  
their mortgage and let it go into tax forfeiture. If I could be kept in the loop on the  
demo process I would appreciate that. The City can use my contact information as a  
source of notification for Wells Fargo going forward if that is acceptable.  
Moermond: Mr. Magner, can your people do that?  
Magner: we can keep him on the mailing list.  
Coleman: that’s fine, thank you.  
Moermond: so I’ll send this back to Council February 9 and my recommendation will  
be removal within 15 days with no option to repair.  
Coleman: very good.  
Referred to the City Council due back on 2/9/2022  
4
Ordering the rehabilitation or razing and removal of the structures at 939  
CHARLES AVENUE within fifteen (15) days after the December 22,  
2021, City Council Public Hearing. (Public hearing continued to  
February 9, 2022)  
Thao  
Sponsors:  
Continue PH to February 9, 2022. $5,000 PD must be posted by close of business by  
February 4, 2022 to be referred back to LH on March 8, 2022 at 10 am. If PD is not  
posted, February 9 recommend removal within 15 days with no option to repair.  
Lorrie Miller, owner, appeared via phone  
Moermond: did you want Thooft added?  
Miller: I’ll be talking on my own today.  
Voicemail left for Frey at 10:56 am: this is Marcia Moermond at St Paul City Council  
for 939 Charles. It appears you are unavailable; we’ll copy you on the follow up  
correspondence to the hearing.  
Staff update by Manager Steve Magner: November 21 letter continued the matter to  
today. The following items must be completed: Post a $5,000 Performance Deposit  
plus it must be maintained. We don’t have a Performance Deposit for this property  
currently  
Moermond: has it been maintained?  
Magner: no violations at this moment.  
Moermond: so we started this process a couple of months ago and still no  
Performance Deposit Ms. Miller. Why?  
Miller: I had a closing on another property and I was going to use the funds to post  
that. Unfortunately that closing was supposed to be on December 27, it’s a month later  
and we’re still working on that closing because the buyer got a new job and had to  
requalify with the lender. I’m told we are within 3 days of closing. I am getting  
conflicting information, but between now and February 4.  
Moermond: ok. We do have a Code Compliance done in November. Have you got any  
bids on the doing the work?  
Miller: I’ve had contractors through but haven’t physically received emails for those  
bids yet.  
Moermond: I have to say, it has been a long time for a basic $5,000 Performance  
Deposit. I don’t know how you intend to finance the rehab itself. Are there proceeds to  
cover the rehab costs? What is your thinking there?  
Miller: I have this closing and then another one February 25. Between the two I’ll have  
close to $300,000.  
Moermond: and you have to know I don’t have $5,000 which is the simplest  
requirement for continuing the case. I’m going to put this in front of Council on  
February 9 and if I don’t have $5,000 by then I’ll recommend it is removed. If you do  
get that posted by close of business February 4 then I’ll keep working with you to get  
the work plan and financing in place. I have to treat this like others, and we’ve gone on  
longer than we would already waiting for that Performance Deposit. That has to be  
taken care of to continue this conversation.  
Miller: ok, thank you.  
Referred to the City Council due back on 1/26/2022  
5
Ordering the rehabilitation or razing and removal of the structures at 879  
SIXTH STREET EAST within fifteen (15) days after the January 12,  
2022, City Council Public Hearing.  
Prince  
Sponsors:  
Layover to LH February 8, 2022 at 10 am. $5,000 PD must be posted by close of  
business February 4, 2022.  
Roy Carlson, owner, appeared via phone  
Carlson: the guy wants to pay the $5,000 but he thought it was next Tuesday.  
Moermond: who is this gentleman, we can send him the materials?  
Carlson: I don’t have the information with me, I’m unloading freight in Windom, MN. If I  
can call back with it that?  
Moermond: and you told staff you’d call back with that information Jan 12 and we don’t  
have it yet.  
Carlson: right, I didn’t get a chance to get him together with me. I tried to get a hold of  
them, but it has been tough. He had a family death in Kansas and was out of town for  
a week. I’ll get ahold of his information when I get back home.  
Moermond: we’ll send you a follow up letter but getting that Performance Deposit  
posted is required to continue this conversation at all.  
Carlson: I understand that. He’s really interested in the property.  
Moermond: I need that done by close of business February 4. If you do that then I’ll  
talk to you more February 8 and we need his contact information.  
Laid Over to the Legislative Hearings due back on 2/8/2022  
Making Finding on Nuisance Abatements  
6
Making finding on the appealed substantial abatement ordered for 318  
EDMUND AVENUE in Council File RLH RR 21-11.  
Thao  
Sponsors:  
Layover to LH February 8, 2022 at 10 am. By close of business February 4, 2022 PO  
must submit 1) updated work plan for completing the project and 2) updated proof of  
financing.  
Aychoeun Tea, representing owner, appeared  
Moermond: what we are doing today is looking at 318 Edmund, it has been six months  
since you got time to rehabilitate. This is the hearing to determine whether you are  
done, and if you aren’t, where we go from here.  
Staff update by Manager Steve Magner: a letter was sent January 5 scheduling the  
Legislative Hearing today. It is my understanding that Mr. Bruhn is currently out but we  
did receive some information from Mike Palm, senior building inspector saying framing  
was 80% completed, plumbing rough in had passed, and there is no permit for HVAC  
yet.  
Moermond: so you’ve started and you’re barely halfway done.  
Tea: yes. I need more time.  
Moermond: do you still have the money to finish and pay the contractors?  
Tea: yes.  
Moermond: and you gave me a work plan six months ago and you haven’t kept up on  
that work plan. I need a new one that shows me you’ll get it done in the next six  
months. Are you still using the same contractors?  
Tea: plumbing and electric yes. Heating I may change. He won’t show up and keeps  
telling me to wait. He had a guy to do the duct work and he just disappeared. That’s  
what he’s telling me.  
Moermond: ok, so what I need from you to continue your Performance Deposit is a new  
work plan with the actual contractors you will be using. So if you have a new HVAC  
contractor I need a new bid. And then a new schedule since you’re obviously off  
schedule. Are the rest of the contractors the same?  
Tea: yes.  
Moermond: can you have these materials to me in 2 weeks? I’ll look at this February 8  
and you have those materials to me--  
Tea: can I have 3 weeks?  
Moermond: why?  
Tea: if I use a new person for HVAC I need to find someone.  
Moermond: why don’t you have that done already if you knew it was a problem?  
Tea: I took his word but he just delays, delays, delays. Now it is cold and he cannot do  
anything.  
Moermond: it sounds like Mike Palm said you need the heat on to finish plumbing and  
other work. So it is important to get that done. I want to talk to you February 8. You  
get a contractor in there and we’ll talk February 8. You give it a try.  
Tea: I’m asking for six months.  
Moermond: I know you are, and I’m saying there is conditions for another six months.  
You showed me money, bids, a schedule and promised six months. Now you want an  
additional six months because you aren’t done. I need to have a new promise from you.  
You know I lack some faith because you didn’t come through the first time. Let’s get it  
right this time and clean up those plans. Get a new bid or work with your current  
contractor to get it revised. I need that paperwork by February 4. Any questions?  
Tea: no.  
Laid Over to the Legislative Hearings due back on 2/8/2022  
7
Second Making finding on the appealed substantial abatement ordered  
for 1033 GALTIER STREET in Council File RLH RR 21-61.  
Brendmoen  
Sponsors:  
Layover to LH February 8, 2022 at 10 am for update on finaled permits and CC  
Certificate status. (CPH February 16, 2022)  
Barry Rohweder appeared via phone  
Phillip Schloss appeared via phone  
Moermond: we’re doing a second follow up hearing to make a finding about it being  
rehabbed. I know the last time we spoke you were about 60% done in September.  
Staff update by Manager Steve Magner: a letter was sent January 10, 2022 setting this  
Legislative Hearing date. A Code Compliance certificate hasn’t been issued. We see  
January 10 a plumbing permit was attempted to be done online.  
Rohweder: I was unaware of the Plumbing permit but I thought all mechanical permits  
were signed off. I discovered Bruhn was out of town out of week. I met up with Clint on  
Thursday this past week. I called this morning to meet him again about those 4 or 5  
inspections. Now Clint is out of town. Now I called Mike Bass and he said it will have to  
wait until Nathan is back.  
Moermond: the plumbing permit looked like B and B plumbing January 10 for a water  
heater. Does that sound familiar?  
Rohweder: no, it has been in there for 2 months. Unless he had to get a permit closed  
and didn’t pull it originally. Clint wouldn’t come out if it wasn’t signed off. So now they’re  
both out. Mike said he can’t do it this week and Nathan is back in town Monday.  
Moermond: I’m going to double check this plumbing permit situation. We have on  
finaled permit for plumbing for 2 water heater lines and ice maker and kitchen sink. So  
maybe they didn’t pull all the ones they needed too? Or there is something more going  
on. It appears to be the same company.  
Rohweder: how would they get their rough in without permits pulled?  
Moermond: they had *a* permit pulled but it didn’t cover all the work, it appears. So  
they’re trying to work it out. Do you want to reach out to them and tell them they need  
to go in person to get permits for a Category 3 Vacant Building?  
Rohweder: yes. I can follow up with those. I did send some pictures to Mai. It turned  
out really nice.  
Moermond: so you are darn close to being done. We can reach resolution on this in a  
couple of weeks?  
Rohweder: yeah, I hope to have it done as soon as Nathan is back in town. But now I  
have to wrestle with this plumbing issue I wasn’t aware of.  
Moermond: I am going to follow up with you February 8 and put it on City Council  
calendar the following week and hopefully this will be closed.  
Laid Over to the Legislative Hearings due back on 2/8/2022  
11:00 a.m. Hearings  
Summary & Vehicle Abatement Orders  
8
RLH SAO 22-4  
Appeal of Robert R. Savela to a Vehicle Abatement Order at 1387  
THOMAS AVENUE.  
Jalali  
Sponsors:  
Grant to February 11, 2022 for compliance.  
John Savela, son of owner, appeared via phone  
Robert Savela was in background, but did not speak  
[Moermond gives background of appeals process]  
Staff report by Supervisor Lisa Martin: January 10, 2022 we issued a Vehicle  
Abatement Order to the occupant and owner at this address. A commercial vehicle  
parked in a residential neighborhood. It does have expired tabs from 2021. Compliance  
date of removal was January 17.  
Moermond: sounds like you’re looking for more time?  
Savela: we got ahold of the Veteran’s Administration and they are going to tow it away.  
They need the VIN and some photographs. I don’t know how long it will take for them  
to pick it up.  
Moermond: you’re taking care of that information for them today?  
Savela: yes, I’ll give that to them today. I have a reference number too, 0IE76207  
Veteran Car Donations.  
Moermond: you’re getting started on that today. Do that. I’ll recommend the Council  
gives you to February 11 to get it off your property. So they have a couple weeks to  
come get it. I’ll put this on the Council agenda February 9. We’ll send a letter  
confirming that. If something happens with the VA give my office a call so we can deal  
with that. Hopefully this is buttoned up by the 11th.  
Referred to the City Council due back on 2/9/2022  
1:00 p.m. Hearings  
Vacant Building Registrations  
9
Review Request for Appeal of Shekita Moore to a Vacant Building  
Registration Notice at 201 GENESEE STREET.  
Brendmoen  
Sponsors:  
CPH Feb 9, 2022. Items 1, 4, 6, 8, 9, 10, 11, and 13 to be reinspected by February 8,  
2022. Grant to June 1, 2022 for balance of the September 21, 2021 orders (items 2, 3,  
5 & 7).  
Kristina Serrano, property manager, appeared via phone  
Moore: I just spoke with Shekita and she is at work and is unable to attend.  
Voicemail for Moore: this is Marcia Moermond calling you about the order to vacate  
and I understand you aren’t available. We’ll proceed and copy you on the follow up  
information.  
Moermond: I’d like to invite some feedback on your work plan. I’m glad you got  
something together to respond to.  
Staff update by Supervisor AJ Neis: in reviewing the work plan for 201 Genesee, on  
the correction notice there were about 14 violations, not including the revocation. Not  
all were addressed on the work plan. Some can’t be addressed, like maintaining the  
grass. Some interior items such as the water damage in the living room ceiling were  
not mentioned, in addition to a light fixture. Seeking an additional one week to  
complete the items. Some of the things aren’t likely to be completed like the fence,  
but the mattresses can be removed from the garage. There is flashing on the back  
door at the top it needs to be secured; my concern is on the bottom is the metal has  
bent and sheared so if someone didn’t have shoes on it is a cut hazard. I would like to  
see that taken care of.  
Moermond: so a couple of interior items that aren’t on the list, and exterior items that  
could get extensions due to weather. I thought the garage roof and fencing were good  
candidates for further extensions since they would be hard to do now. Would you be  
willing to take one more swing at a work plan and add in the other items and propose  
some deadlines?  
Serrano: it addresses the bathroom and ceiling below where it is labeled “water  
damage.”  
Moermond: it says bathroom caulking and ceiling patch. You meant to the living room  
when you said that?  
Serrano: yes, right below there was a small square removed by the plumber to make  
sure it wasn’t a plumbing issue. It needs to be recaulked in the bathroom, and also a  
small patch.  
Moermond: a loose sink is also mentioned in the bathroom.  
Serrano: I can caulk that.  
Moermond: so the living room is dealt with, that’s what you mean by patch. The light  
fixture mentioned? Have you had that checked?  
Serrano: it does work. I was unable to actually take off the globe. The screw holding it  
on turns but doesn’t come off. It does work. There hasn’t been any more water that  
has come through. Once they closed the shower curtain it was fine. I’m trying to take  
the cover off to look, but it does work. It was a couple inches away from the square  
cut in the ceiling.  
Moermond: you have this work plan for this week. How is it going? Will you be done  
this week?  
Serrano: I believe so. I’m actually on my way to the hardware store now. That’s why I  
just spoke with Shekita to let her know I was on my way.  
Moermond: and you’ll get a dumpster to get rid of a lot of mattresses and tires? I  
assume that is still there?  
Serrano: yes, and the owner is working on clearing that out.  
Moermond: I am willing to give you an extension to complete this work plan. You gave  
yourself a January 31 deadline. I can’t put this in front of Council until February 9, so  
I’ll give you an extension until then. Actually, Mr. Neis can an inspector go out before  
February 9?  
Neis: let me look.  
Moermond: for the exterior items I’ll give you to June 1, 2022 for garage, sidewalk. If  
you are able to do this I’ll recommend your Certificate of Occupancy be reinstated and  
you are out of the Vacant Building program. That’s the biggest carrot I can put out  
there.  
Neis: yes, we can have someone out before February 9. It would be Supervisor Shaff.  
You will need to contact her directly. [gives Shaff’s number]  
Serrano: can you list the items I have to do now so I don’t miss anything?  
Moermond: yes.  
Serrano: and the yard work, I went out several times to do it. I’m not sure why it  
continues to be on there. There is a vacant lot next door, maybe there is confusion  
there?  
Moermond: these orders are from September, so it is impossible to know.  
Serrano: I cut the trees and branches myself. Just wanted to state that.  
Received and Filed  
10  
RLH VBR 22-7  
Appeal of Sandra Sattler to a Vacant Building Registration Notice at 469  
MACALESTER STREET.  
Tolbert  
Sponsors:  
Grant the appeal and release the property from the VB program.  
Sandra Sattler, owner, appeared via phone  
[Moermond gives background of appeals process]  
Staff report by Supervisor Matt Dornfeld: opened as a Category 1 Vacant Building  
December 22, 2021 by inspector Hoffman who received a referral from Code  
Enforcement Officer Kedrowski. December 1, 2021 Kedrowski issued a Vehicle  
Abatement Order for an inoperable vehicle with expired tabs. He found not in  
compliance on December 17 and proceeded to issue a tow order and referred the file  
to the Vacant Building program. He cited the dwelling appeared vacant and secured for  
some time. Tall grass and weeds issues in the fall and no response to the vehicle  
order. There were also similar violations in 2017 with a vehicle and tall grass and  
weeds. There are also some abandoned and a few open permits from back in 2016.  
Moermond: basically the inspectors are showing up due to yard conditions and the  
vehicle and based on that it looked abandoned and vacant. Why are you appealing Ms.  
Sattler?  
Sattler: this was the first I’m hearing about the tall grass and weeds. I’ve never heard  
that before. I did get a notice on the vehicle, which is gone now. It wasn’t running. It  
was in the garage but the neighbor’s tree had fallen on the garage, so I had to get the  
garage torn down. That has been taken care of.  
Moermond: do you live here?  
Sattler: I do.  
Moermond: and the overgrown part was definitely an observation I had when I saw  
photos of the vehicle. It was very overgrown. I don’t think the inspector issued an order  
on that in December.  
Dornfeld: correct.  
Moermond: how long have you lived here?  
Sattler: 23 years.  
Moermond: so the vehicle is gone. You are living there. The exterior conditions flagged  
this for the City. I’m inclined to grant your appeal and get you out of the Vacant  
Building program and hopefully you won’t keep bumping into this problem every couple  
of years. Based on what I’m hearing and a verbal commitment you keep an eye on the  
yard. I’ll recommend the appeal is granted and you are out of the Vacant Building  
program.  
Referred to the City Council due back on 2/9/2022  
11  
RLH VBR 22-5  
Appeal of Jay Mitchell to a Vacant Building Registration Fee Warning  
Letter at 716 SIMS AVENUE.  
Yang  
Sponsors:  
Waive the VB fee for 90 days (to April 5, 2022). Permits must be filed and Fire C of O  
reinstated before being released from the VB program.  
Jay Mitchell, property representative, appeared via phone  
[Moermond gives background of appeals process]  
Staff report by Supervisor Matt Dornfeld: back in June of 2020 this was opened as a  
Category 2 Vacant Building. It came in front of you and you requested it be monitored  
as prelim Vacant Building. We did that and then come January 5, 2021 still vacant.  
Open permits. So the inspector upgraded it to a Category 1 from a prelim. I assume we  
are here to discuss the Vacant Building fee. Looking at the permits on file, I have a  
hard time following what is going on. There are open permits, abandoned and expired  
permits, withdrawn permits, active permits with no activity. A lot of stuff on the  
computer and I couldn’t quite make out what was going on.  
Mitchell: we abandoned those permits, we switched plumbing contractors. There was a  
break in with squatters we had to get out. They stole some plumbing, so we had to get  
another permit. We had electrical work and then some insulating and Sheetrocking.  
We’re Sheetrocking now. We expect to be done in the next six days, then we’ll just  
need the finals to close out the open permits.  
Moermond: I’m fine giving you a 90 day waiver. The anniversary date takes you through  
April 5, 2022. If you have your Certificate of Occupancy reinstated and permits closed  
you have no fee for this year.  
Referred to the City Council due back on 2/9/2022  
1:30 p.m. Hearings  
Orders To Vacate - Fire Certificate of Occupancy (NONE)  
2:00 p.m. Hearings  
Fire Certificates of Occupancy (NONE)