Saint Paul logo
File #: RES PH 22-142    Version: 1
Type: Resolution-Public Hearing Status: Passed
In control: City Council
Final action: 6/1/2022
Title: Approving the request for sound level variances for S.J. Louis Trenchless to allow for multiple cure-in-place sewer liner projects at four (4) locations (Lexington Parkway North from University Avenue to Fuller Avenue, Darlene Street from Hoyt Avenue to Larpenteur Avenue, Energy Park Road at Intercampus Transitway, and Palace Avenue from Macalester Street to Snelling Avenue South) in the month of June 2022.
Sponsors: Dai Thao
Ward: Ward - 1
Attachments: 1. Application, 2. ENS, 3. Map Lexington Pkwy N. from University Ave to Fuller Ave, 4. Map Idaho Ave E. and Darlene St. and Hoyt Ave E., 5. Map Energy Park Dr to Raymond Ave and U of MN Transit Way, 6. Map Palace Ave Snelling Ave to Macalester St., 7. Owners list Lexington Pkwy, Fuller-University Area, 8. Owners list Idaho and Darlene St. and Hoyt, 9. Owners list Energy Park Dr to Raymond Ave and U of M Transity Way, 10. Owners list Palace Ave, Snelling Ave to Macalester St, 11. Notice to Owners- Lexington Pkwy N from University Ave to Fuller Ave, 12. Notice to Owners-Darlene St from Hoyt Ave to Larpenteur Ave, 13. Notice to Owners-Energy Park Rd at Intercampus Transitway, 14. Notice to Owners-Palace Ave from Macalester St to Snelling Ave S, 15. Letter to Applicant
Title
Approving the request for sound level variances for S.J. Louis Trenchless to allow for multiple cure-in-place sewer liner projects at four (4) locations (Lexington Parkway North from University Avenue to Fuller Avenue, Darlene Street from Hoyt Avenue to Larpenteur Avenue, Energy Park Road at Intercampus Transitway, and Palace Avenue from Macalester Street to Snelling Avenue South) in the month of June 2022.

Body
WHEREAS, Chapter 293 of the Saint Paul Legislative Code was enacted to regulate the subject of noise in the City of Saint Paul; and

WHEREAS, §293.09 provides for the granting of variances from the sound level limitations contained in §293.07, upon a finding by the City Council that full compliance with Chapter 293 would constitute an unreasonable hardship on the applicant, other persons or on the community; and

WHEREAS, S.J. Louis Trenchless, represented by Pat Hillan, General Superintendent, who has been designated as the responsible person on the application, has applied for four (4) sound level variances, at a requested sound level limit of 100 decibels (dBA) at no specific distance, for sewer construction work, with use of heavy trucks with air compressors, internal generators, back up alarms and hydraulic pumps with sewer lining projects during the month of June, 2022 for the Lexington Pkwy N from University Ave. to Fuller Ave., Darlene Street from Hoyt Ave. to Larpenteur Ave., Energy Park Rd at Intercampus Transitway, and Palace Ave from Macalester St. to Snelling Ave S sites. The project proposes to allow elevated sound levels during one to two nights, one for sewer cleaning and inspection, and one for a sewer lining at each of the four sites, with a sewer liner continuous curing process. Applicant indicates the work period proposed as 8:00 p.m. until 7:00 a.m., with use of heavy equipment, hydraulic pumps, air compressors and hand- held power tools, back up alarms, critically silenced pumps and truck mounted boiler, not to exceed 100...

Click here for full text
Date NameDistrictOpinionCommentAction
No records to display.